Academic/Library Building Construction Photos

September 2006

Construction Photos (click on the image to enlarge)

Picture of framing to enclose staircase entrance.

Picture of faculty lounge area

Enclosing the student entrance to the 2nd floor

Faculty lounge on the 2nd floor
Picture of wiring trays Picture of wiring trays
 Wiring trays in place on the 2nd floor hallway.
Picture of classroom with wire supports hanging from ceiling. Picture of classroom with wire supports hanging from ceiling
Classroom walls have been primed on the 2nd floor. Supports hang from the ceiling.
Picture of library reference desk area Picture of circulation desk location

The view at the entrance to the library.

The circulation desk location is on the left as you enter the library.
Picture of circulation desk and new books display location Picture of library staff offices
The view standing at the back of the library looking toward the circulation desk and new books display area. Library staff offices
Picture of periodical seating area Picture of book shelving area
Student seating and periodicals are this location of the library. Looking toward the circulating book shelving area. Group study rooms are on the left side of this picture.
Picture of worker using a paint sprayer Picture of the enclosed elevator shaft
Workers spraying paint on the walls in the new building. The elevator shaft
Picture of cement truck Picture of sidewalk
Pouring the sidewalk leading to the student entrance. The sidewalk leading to the front of the new building.

 

Construction Scrapbook Homepage | SCC Library Home

Spartanburg Community College
Library

Copyright © 2006 Spartanburg Community College. All rights reserved.
Last update 10/26/2006