Construction
Photos (click on the image to enlarge)
Members of the Library Advisory Committee tour the
new building. Members are standing in the front lobby of the new
building.
Peter Stone standing in the coffee shop located in the
front lobby of the new building.
Library staff members standing in the lobby area of
the new building.
The gray pipes are located at the
information/reference desk area in the new library.
Library staff offices
The LRC Dean standing in her new office.
Advisory committee members are standing at the staff
entrance to the new building.
This is the location of the library staff
bathroom...you can tell how happy we are to have this!
Advisory committee members are at the student
entrance to the second floor of the new building.
Looking down the hallway on the 2nd floor of the new
building as you get off the staircase at the student entrance.
Humanities faculty offices will be on the right and labs will be located
on the left.
Standing in the corner of the 2 hallways on the
second floor.
Looking down the hallway on the 2nd floor of the new
building. Classrooms are on the right side of the hall and seminar rooms
will be on the left side.
The elevator shaft location on the 2nd floor of the
new building.
Standing on the 2nd floor looking toward the
location of the curved staircase leading into the lobby of the new
building.
Looking into the library space from the second floor
of the new building.
A view of the new building from the Student Services
building on a rainy June afternoon.
Workers installing the brick work on the side of the
new building.
Flags are placed on the top of the building as
workers install the roof on the new building at the end of June.