October 2006 |
|
Construction
Photos (click on the image to enlarge) |
|
 |
 |
|
The staircase in the lobby entrance. |
The serving window of the Cupa Cabeana Coffee
Shop located in the lobby of the building |
 |
 |
|
Work continues in the Library Instruction Classroom |
Workers begin installing ceilings in library staff
offices. |
 |
 |
|
Wiring, light fixtures and ceilings are installed in
classrooms and offices on the 2nd floor. |
 |
|
Standing in the stairwell entrance
to the 2nd floor of the new building. |